Project’s Objectives
The issue that have to be solved within this project is of high importance for such an important matter like energy generation. This issue consists in ensuring the corrective – predictive maintenance corresponding to industrial turboinstalations that are parts of cogenerative plants. In this very moment, the above mentioned problem reprezents a big step to climb within the development and the exploitation of performant industrial turbomachines.
In order to increase the efficiency and the profit, the companies that manufacture cogenerative plants provided with turbine power group rely on rising the functioning time of the machines. An integrated maintenance plan (preventive and especially predictive) provides the industry with an alternate solution of maintenance. The team that participates in the elaboration of this thesis wishes to bring its contribution for rising of the reliability of the equipments, to increase their efficiency and, last but not least, to decrease the maintenance and repair costs. These purposes will be achieved by consistent use of maintenance algorithm and by restrictive, severe diagnosis control. A clear process will be issued, process that includes the most performant supervising practical activities corresponding to the functioning of turbomachines. The causes that generate malfunctions are revealed and quantified, a diagnosis is elaborated and corrective actions are proceeded in order to remove the cause and the arisen deficiency.
The evolution from our country of designing and manufacturing of industrial turbo machines (mainly P01) that are used especially within the cogenerative plants as well as the unavoidability of the integration in high performant industrial organizations (e.g. EU) impose the development of new engineering drafts and the absorbtion of the advanced technologies from the domain of maintenance of performant industrial turbomachines.
The objectives of this thesis are as follows:
- Designing of an unitary algorithm a new engineering drafts basis and the integration of advanced technologies within maintenance area, in order to increase the efficiency of industrial gas turbines. with high output that are parts of cogenerative plants.
- Creation of a movable system for ensuring predictive maintenance that are parts of cogenerative plants.
- Supervising of the functioning of the cogenerative installation and permanent improvement of the proposal algorithm.
The idea of corrective-predictive maintenance (a diagnosis basis, if necessary) with consistent applying over turbine power group of cogenerative plant had arisen from the need to reduce the total maintenance expenses, and in the same time, maintaining of a high acceptable reliability level. Accurate establishing of the ideal diagnosis period is a problem that has to be solved using the issued algorithm and by creating of a database corresponding to functionality and deficiencies.
Project’s stages
Stage I -
New directions and tendencies in approaching turbomachinery maintenance
Stage II -
New procedures and methods to realize a unitary system of corrective–predictive maintenance for industrial turbo machinery
Stage III -
Realization of the experimental model
Stage IV -
Presentation, dissemination si promotion for the obtained results
Stage V -
Experimentation and homologation of the results. Dissemination
|